Attention all registered users. The new forum upgrade requires you to reset your password as you logon for the first time.
To reset your password choose this option that is displayed when you attempted to login with your username: "Forgotten your password? Click here!"
You will be sent an e-mail to the address that is associated with your forum account. Follow the simple directions to reset your password.
If this is your first visit, be sure to
check out the FAQ by clicking the
link above. You may have to register
before you can post: click the register link above to proceed. To start viewing messages,
select the forum that you want to visit from the selection below.
I've had little time to work on mine this week, I did get the steering linkage together but I'm waiting on a new prop before I get the stern half finished.
I might leave the motor in the wet once more just for the simple design and for now I just want it to be functional until I can get time to invest in a ballast system and build a real WTC.
So looking at your design, the same WTC in the centre is the air compartment for the RCABS system and the bladders will be exposed to the outer hull?? What about the microswitch to prevent overinflation or am I way off target here...
The WTC is only about 50% done. It will have an overinflation system when finished. The center section and the front section supply air for the bladder which is larger than the ones in my other WTC'S. The rear section is sealed off from the rest of the WTC. Dave.
sigpic"Eat your pudding Mr Land"
"I ain't sure it's pudden" 20K
I finished up the WTC today. It seems to work well. I hope to test it this weekend in real H2O. Then on to the install in the hull. Fun Fun Fun! Here is a photo of the WTC taken apart into it's sub-assemblies. Dave.
sigpic"Eat your pudding Mr Land"
"I ain't sure it's pudden" 20K
I've just had the time to work on the rear linkage and might have time to order a prop from a place in San Diego that offers brass props that are the size I need.
Once I setup the hull's latching system I'm taking pictures!
I'll worry about the WTC later this week after I get back from Ann Arbor MI.
I have made great progress. The WTC is mounted in the hull, and the linkages are in and working. I have also tested the jet pump in the water with the motor power unit I have installed in the wtc . I am VERY happy with the output thrust. The motor did not seem to be straining at all, but I will do current tests to see. I am working on joining the two hull halfs now. So far so good! Here is a photo of the rear linkages. Dave.
sigpic"Eat your pudding Mr Land"
"I ain't sure it's pudden" 20K
I have designed a system to interlock the upper and lower hulls together. I am about half way through its construction. Here is a photo of the WTC with the bladder installed. Dave.
sigpic"Eat your pudding Mr Land"
"I ain't sure it's pudden" 20K
Comment