Some of you may or may not know but I have been researching, designing and redesigning a new wtc system for the last 1.5yrs. While I have made a few announcements I have not yet revealed many photos. Except for a few of the people I have been using to test and attempt to break the product not much else is out there. This has also resulted in a lot of emails lately asking for info because of a lack there of.
Here are a few shots of what it looks like and a bit of me going through the motions to get it together and tested.

Twin 4" ballast tanks

Building my Ohio BT

Test fitting in a Thor Permit

Shot of my newly assembled ER

A shot of my BT and Battery Compartment in my OHIO

Testing fit ups and mounting in a Sturgeon

My prototype BC and BT module test fit with a temp ER module

This shows how the ER module mounts to the BT module

Water jet cut lexan equipment tray test piece...very cool stuff

Group of motors for the testers

new precision machined planetary reduction gear 4.64]
[/url]
New endcaps molds

prototype equipment tray made of g10 from templates designed in cad

Mocking up servo mount for ballast operator
Here are a few shots of what it looks like and a bit of me going through the motions to get it together and tested.

Twin 4" ballast tanks

Building my Ohio BT

Test fitting in a Thor Permit

Shot of my newly assembled ER

A shot of my BT and Battery Compartment in my OHIO

Testing fit ups and mounting in a Sturgeon

My prototype BC and BT module test fit with a temp ER module

This shows how the ER module mounts to the BT module

Water jet cut lexan equipment tray test piece...very cool stuff

Group of motors for the testers

new precision machined planetary reduction gear 4.64]

New endcaps molds

prototype equipment tray made of g10 from templates designed in cad

Mocking up servo mount for ballast operator
Comment