Halibut SSN 587- Special Projects Modification drawings (High Resolution)

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts
  • tom dougherty
    Senior Member
    • Jul 2005
    • 1355

    Halibut SSN 587- Special Projects Modification drawings (High Resolution)

    USS Halibut in the first modification to Special Projects configuration, circa 1968. The Regulus hanger has been reconfigured. The saturation diving chamber and superstructure thrusters are not yet installed. Test thruster mounted atop the hanger installation on deck. Saturation diving system information at top of post Click image for larger version  Name:	Mk 11 saturation system.jpg Views:	0 Size:	176.0 KB ID:	149138Click image for larger version  Name:	Halibut Drawngs-Aft.jpg Views:	0 Size:	3.64 MB ID:	149137Click image for larger version  Name:	Halibut Drawings-Forward.jpg Views:	0 Size:	3.14 MB ID:	149136
Working...
X