The casing for the first
The casing for the first half of the mold is ready.
I also sealed the gap between boat and board with
paraffin wax.

after the silicone rubber layer I will apply a layer of plaster,
and then the rest of the casing is filled with PU foam.
This will be leveled to the top of the casing, and the casing sealed with
another board. Then the whole is put upside down, and I should have
a mold half in a box with a fixed plaster interior, and a
removable silicone rubber inner mold
The casing for the first half of the mold is ready.
I also sealed the gap between boat and board with
paraffin wax.

after the silicone rubber layer I will apply a layer of plaster,
and then the rest of the casing is filled with PU foam.
This will be leveled to the top of the casing, and the casing sealed with
another board. Then the whole is put upside down, and I should have
a mold half in a box with a fixed plaster interior, and a
removable silicone rubber inner mold



Comment